Short History of Kutahya Organized Industrial Area

The working organised industrial zone foundation in kutahya is based on 1970s years. With the decision of The Council of Ministers 29.03.1973 of the board of history and 7\6177 numbered  in line, the first step is taken to establishment of organised industrial zone in kutahya.

After the cabinet’s decision; first perceptible attempts to organised industrial zone in our place begins with imbolizing of location where it locates on the way of Alayunt quarter; saka village, at the date of 23.10.1979, at 17.07.1980 by taking prior consent from Ministry of Development and Housing plan working is begun. At the 1990 year district Office organization is formed and building scheme which is formed by 100 numbers industrial parcel , 215 hektars of land on the area of board of directors it’s 1.096.000 m varying size between 3.000m and 50.000 m is made.

Starting the working of socialization, the part of 208 hectars are socialized at 08.11.1993 and other part of 7 hectars are socialized at 25.03.1994

At 1993 road, water, canalization, raindrop,electric and telekominication’s infrastructural projects is made. At 1994 constructions is begun by giving out and at 1998 it is finished.

We provide  by ownselves drinking&using water,existing in our area, with deep hole water pumps. drinking water network is provided by 1000 tons built in tanks and 100 tons elevated tanks with it’s own energy at 3,5 atü.

To our organised industrial zone for it’s electric energy, from nitrogen centrum, is pulled double aerial electricity transmission line which is 13.438 km 477 MCM. And it is distirubuted to intra regional distribution network, with 17 numbers miscelloneous size transformers.

For answering Organised industrial zone’s telecominication need;by making an agreement to Telecom at the power house 5000 subscription dijital systems(systems 12) plugboards which are made by our area are put into service.

In connection with locating in the border of Alayunt, main rail way station which is Afyon, Eskişehir, İzmir railway junction point, Organised Industrial Zone field, from the point of railway connection has an important advantage.